ASUSTek Computer Headquarters Complex

To meet domestic development needs, ASUSTek bought additional property near its present factory in Guandu for a new headquarters building and production plant, consisting of three major areas: a Headquarters Administration/Research & Development Center, A Staff Recreation Center, and a Production Factory.

 

Our design adopts a low ground coverage plan to achieve maximum outdoor open space. The three principal structures are connected by the entrance lobby and covered passages which forms a landscaped center court. We hope to preserve the natural scenery of Guandu while also establish a local landmark which will express the high-tech image of our client.

 

The Factory has a simple mass as a result of its functional requirement, while the Administration Building is both taller and more massive than the two other structures and designed as a multi-faceted building to mitigate its size. The Recreation Center and the Administration Building share a common lobby which faces the principal entrance way, with a lively, curved exterior wall for additional interest. Exterior walls are finished with stone veneer, aluminum and glass, without decorative adulteration, to achieve an image of precision, efficiency and cleanliness.

Location:Taipei

Structural system:RC、Steel

Site area:23,750㎡

Building coverage:10,230 ㎡

Total floor area:113,270 ㎡

No. of stories:Office:4 below、16 above grade、Recreation Center:4 below、5 above grade • Plant:2 below、5 above grade

Cost:NT$ 2,240,000,000,000

Design period:2000.05 ~ 2002.10

Const. period:2002.09 ~ 2004.08

Category: Manufacturing、Office、R&D、Sport / Leisure