TSMC Solar Module Facility

This project is located in Central Taiwan Science Park. The facility is the first advanced thin-film solar technology R&D center, mainly manufacturing CIGS thin-film solar battery panel and also providing pioneering solutions. 

 

The site occupies 5.5 hectares, consisting of factory, labs, affiliated offices, and a cafeteria. In order to escalate the efficiency of production capacities, this design uses data analysis to optimize the economic benefits of the interior functions and practical construction. The landscape’s ups and downs are used to enhance the visual comfort of the exterior. Selected specimen trees are the primary characteristic of the landscape design, together with arbour decorating the path that connects each entrance.

Location:Central Taiwan Science Park

Structural system:RC

Site area:51,511㎡

Building coverage:13,263㎡

Total floor area:75,691.56㎡

No. of stories:1 below, 4 above grade

Cost:NT$423,872,000

Design period:2009.12 ~ 2010.8

Const. period:2010.8 ~ 2011.6

Category: Manufacturing、R&D

Share This: